Projects



1 - Supply of Materials
Providing materials under multiple contracts, including CS&SS line pipes (ranging from ½” to 40”), flanges and fittings (from ½” to 42”), valves (from ½” to 32”) in various pressure ratings, gaskets, stud bolts, electrical materials, instrumentation, and spare parts to ROO/BP in the Rumaila Oil Field, Basra, Iraq. The status of project (on-going).




2 - Supply of Materials
Provision of safety materials, including anchor bolts, stud bolts, nuts, electrical consumables, steel angles, air conditioning units, carbon steel pipes, fittings, flanges, galvanized cable trays, valves, fire grooved fittings, disposable coveralls, 3M half masks with filters, face shields, and camp consumables. This materials supply project was carried out for ENKA at the Combined Cycle Power Plant in Al Nasiriyah, Dhi-Qar, Iraq. The status of project (completed).


3 - Supply of Equipment
Provision of a medium voltage (MV) current transformer (33 kV) to the Ministry of Electricity (MOE) at the Maysan Electricity Distribution Directorate. The status of project (completed).




4 - Supply of Materials
Provision of spare parts for high-pressure (HP) filters, dosing skid for the CPF, bypass lines for test injection pumps, flow line pup-joints, crossovers, check valves, and plug valves under multiple contracts for LUKOIL Mid-East Limited in the West Quran-2 Oil Field, Basra. The status of project (completed).



5 - AL SALAM Power Substation Project
33/11 Kv, 2×31.5 MVA – Construction, Supplying, Installation, Testing, Commissioning &Start-up of Power Substation 33/11 Kv, 2×31.5 MVA Power Transformer with build 2 house units and laying 33 Kv power cable (1×400 sq.mm) in length 33.5 Km. Turnkey project for Al Najaf Ashraf Government/MOE at Al Salam Power Substation in Al Najaf Al Ashraf. The status of project (completed in 280 days).



6 - Supply of Equipment
Provision of AIS circuit breakers (132 kV) along with an SF6 analyzer, SF6 gas refilling machine, and SF6 gas. This was part of a turnkey project delivered to the Thi-Qar Government and the Ministry of Electricity (MOE) in the Western South Networks, Al Nasiriyah. The status of project (completed in 200 days).


7 - Abu Shtait Water Unit Project
Construction, supply, installation, testing, commissioning, and start-up of a water treatment unit with a capacity of 240 m³/h, including a pump station, ground tanks, piping networks, an emergency power generator, and a control room. This turnkey project was executed for the Al Muthanna Government and the Ministry of Municipalities and Public Works (MMPW) in Al Khidr City, Al Samawa. The status of project (completed in 330 days).


8 - Nafar Power Substation Project
33/11 Kv, 2×16.5 MVA – Supplying, Installation, Testing, Commissioning & Start-up of Power Substation 33/11 Kv, 2×16.5 MVA Power Transformer. Procurement & Engineering project for Al Diwaniyah Government/MOE in Nafar City, Al Diwaniyah. The status of project (completed in 280 days).




9 - Water Booster Pump Stations Project
Commissioning and start-up of three water booster pump stations located in multiple areas of Nasiriyah city. This construction and engineering project was executed for FluorAMEC, LLC as part of the Nasiriyah Water South Project in Al Nasiriyah. The status of project (completed in 930 days).